Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 62 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Bountiful City utility owner | City of Bountiful - (UT) | UT | operating | 30 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Brady independent owner | Ormat Nevada Inc | NV | operating | 30 | Other | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Falls (WA) utility owner | City of Seattle - (WA) | WA | operating | 30 | Hydro | 1921 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chaves County Solar II independent owner | Chaves County Solar II, LLC | NM | operating | 30 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chevron - Lost Hills Hybrid independent owner | MN8 Energy LLC | CA | operating | 30 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Citizens Imperial Solar independent owner | Citizens Enterprises Corporation | CA | operating | 30 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clay Center utility owner | City of Clay Center - (KS) | KS | operating | 30 | Oil | 1948 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Colton independent owner | Erie Boulevard Hydropower LP | NY | operating | 30 | Hydro | 1918 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Community Wind North LLC utility owner | Northern States Power Co - Minnesota | MN | operating | 30 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Community Wind South independent owner | Greenbacker Renewable Energy Corporation | MN | operating | 30 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Copperton Solar Plant No. 1 independent owner | Kennecott Utah Copper | UT | operating | 30 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cutler Hydro utility owner | PacifiCorp | UT | operating | 30 | Hydro | 1927 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Deerfield Wind LLC independent owner | Avangrid Power LLC | VT | operating | 30 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diamond Valley Lake utility owner | Metropolitan Water District of S CA | CA | operating | 30 | Hydro | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Diamond Willow Wind Facility utility owner | Montana-Dakota Utilities Co | MT | operating | 30 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Escondido Energy Storage utility owner | San Diego Gas & Electric Co | CA | operating | 30 | Battery storage | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fair Wind independent owner | Fair Wind Power Partners, LLC | MD | operating | 30 | Wind | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fairview Farms independent owner | Madison Energy Investments LLC | MD | operating | 30 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fenner Wind independent owner | CHI Energy Inc | NY | operating | 30 | Wind | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Benning Solar Facility utility owner | Georgia Power Co | AL | operating | 30 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Gordon Solar Facility utility owner | Georgia Power Co | GA | operating | 30 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fort Stewart Solar Facility utility owner | Georgia Power Co | GA | operating | 30 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | General Chemical independent owner | Tata Chemicals Partners | WY | operating | 30 | Coal | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Geneva Generation Facility utility owner | City of Geneva - (IL) | IL | operating | 30 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Georgia-Pacific Wauna Mill independent owner | Georgia-Pacific Wauna LLC | OR | operating | 30 | Other | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | GRS Arbor Hills independent owner | Gas Recovery Systems Inc | MI | operating | 30 | Other | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gulf Coast Solar Center I independent owner | Arevon Energy, Inc. | FL | operating | 30 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hills Creek utility owner | USACE Northwestern Division | OR | operating | 30 | Hydro | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Holtville independent owner | Greenbacker Renewable Energy Corporation | CA | operating | 30 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kaheawa Pastures Wind Farm Hybrid independent owner | Evergreen Wind, LLC | HI | operating | 30 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kahuku Wind Power LLC independent owner | Evergreen Wind, LLC | HI | operating | 30 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kimball Wind independent owner | Kimball Wind, LLC | NE | operating | 30 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kings Bay Solar Facility utility owner | Georgia Power Co | GA | operating | 30 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mesa Wind Power LLC independent owner | Mesa Wind Power LLC | CA | operating | 30 | Wind | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Meyersdale Windpower, LLC independent owner | Sequitur Renewables, LLC | PA | operating | 30 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midway Solar Farm II independent owner | Dominion Renewable Energy | CA | operating | 30 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Monroe Generating Station utility owner | North Carolina Mun Power Agny #1 | NC | operating | 30 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Montfort Wind Energy Center utility owner | Wisconsin Electric Power Co | WI | operating | 30 | Wind | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mozart Wind Farm independent owner | Mozart Wind, LLC | TX | operating | 30 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Muck Valley Hydroelectric independent owner | Malacha Hydro Limited Partnership | CA | operating | 30 | Hydro | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Navajo Dam utility owner | City of Farmington - (NM) | NM | operating | 30 | Hydro | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Naval Submarine Base Kings Bay independent owner | Kings Bay Naval Base | GA | operating | 30 | Oil | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NEWPP independent owner | Generate ER-NG, LLC | TX | operating | 30 | Gas | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Highlands utility owner | Georgia Power Co | GA | operating | 30 | Hydro | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oberon IB independent owner | Oberon Solar IB | TX | operating | 30 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oneida utility owner | PacifiCorp | ID | operating | 30 | Hydro | 1915 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | OREG 1 Inc independent owner | Ormat Nevada Inc | MT | operating | 30 | Other | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | OREG 2 Inc independent owner | Ormat Nevada Inc | MT | operating | 30 | Other | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | P66 Rodeo Solar independent owner | P66 Rodeo Solar | CA | operating | 30 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Patton Wind Farm independent owner | Exus Pennsylvania Wind Holdings | PA | operating | 30 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pinal Central Energy Center Hybrid independent owner | Pinal Central Energy Center, LLC | AZ | operating | 30 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Piney independent owner | BP Piney & Deep Creek LLC | PA | operating | 30 | Hydro | 1924 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pitts Dudik Solar II independent owner | Elawan Pitts Dudik Solar II, LLC | TX | operating | 30 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Prairie Creek Solar independent owner | Sol Systems | IL | operating | 30 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Horse III independent owner | Red Horse III | AZ | operating | 30 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Redbud Run Solar planned, approvals not started | Dominion Renewable Energy | VA | planned | 30 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Isabel Solar, LLC independent owner | San Isabel Solar, LLC | CO | operating | 30 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Santa Paula Energy Storage LLC independent owner | Santa Paula Energy Storage, LLC | CA | operating | 30 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Second Division Solar approvals pending | Lightsource Renewable Energy Asset Management, LLC | TX | planned | 30 | Battery storage | 2031 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seminole Mill independent owner | WestRock Seminole | FL | operating | 30 | Gas | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seville 2 independent owner | Deriva Energy | CA | operating | 30 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Seymour Hills Wind Project, LLC independent owner | Engie North America | TX | operating | 30 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Simon Solar Farm LLC independent owner | Simon Solar Farm, LLC | GA | operating | 30 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spectrum Solar PV Power Project independent owner | Southern Power Co | NV | operating | 30 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SPI Anderson 2 independent owner | Sierra Pacific Industries | CA | operating | 30 | Other | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sterling I Wind Farm independent owner | AEM Wind LLC | NM | operating | 30 | Wind | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tesoro SLC Cogeneration Plant independent owner | Tesoro Refng Marketing Co Mntn Region | UT | operating | 30 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Top Gun Energy Storage utility owner | San Diego Gas & Electric Co | CA | operating | 30 | Battery storage | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Top of Iowa Windfarm III utility owner | Madison Gas & Electric Co | IA | operating | 30 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tulloch independent owner | Oakdale&South San Joaquin Irrigation D. | CA | operating | 30 | Hydro | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tygart Hydropower approvals pending | Agilitas Energy, Inc. | WV | planned | 30 | Hydro | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vernon utility owner | City of Vernon - (CA) | CA | operating | 30 | Oil | 1933 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Webberville Solar Project independent owner | FRV AE Solar LLC | TX | operating | 30 | Solar | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anson Abenaki Hydros independent owner | Eagle Creek Renewable Energy, LLC | ME | operating | 29 | Hydro | 1950 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Antrim Wind independent owner | Antrim Wind Energy LLC | NH | operating | 29 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Apex NC Solar independent owner | Apex NC Solar, LLC | NC | operating | 29 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Avalon Solar independent owner | Arevon Energy, Inc. | AZ | operating | 29 | Solar | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | BCE Seal Beach independent owner | BCE Seal Beach | CA | operating | 29 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Turtle Wind Farm 2 utility owner | DTE Electric Company | MI | operating | 29 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Busch Ranch Wind Energy utility owner | Black Hills Colorado Electric, LLC | CO | operating | 29 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Charles P Keller utility owner | Village of Rockville Centre - (NY) | NY | operating | 29 | Gas | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Covanta Alexandria/Arlington Energy independent owner | Covanta Alexandria/Arlington | VA | operating | 29 | Other | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CP Kelco San Diego Plant independent owner | CP Kelco US Inc. | CA | operating | 29 | Gas | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Finch Paper independent owner | Finch Paper LLC | NY | operating | 29 | Other | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Forward Windpower LLC independent owner | Forward Windpower, LLC | PA | operating | 29 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Happy Jack Windpower Project independent owner | Deriva Energy | WY | operating | 29 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Iola utility owner | City of Iola - (KS) | KS | operating | 29 | Oil | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kenilworth Energy Facility independent owner | E F Kenilworth LLC | NJ | operating | 29 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | M&G Resins USA under construction | CC Polymers LLC | TX | planned | 29 | Other | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | New England Wind LLC independent owner | Avangrid Power LLC | MA | operating | 29 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ocoee 3 utility owner | Tennessee Valley Authority | TN | operating | 29 | Hydro | 1943 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oxnard Paper Mill independent owner | New-Indy, Oxnard LLC | CA | operating | 29 | Gas | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | PE Berkeley independent owner | Berkeley Cogeneration Facility | CA | operating | 29 | Gas | 1987 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | R.C. Byrd L&D Hydroelectric Project approvals pending | Ohio Power and Light LLC | WV | planned | 29 | Hydro | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Shield Envir Old Town Facility independent owner | ND Paper, Inc. | ME | operating | 29 | Other | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ridgetop Energy LLC independent owner | Terra-Gen Operating Co-Wind | CA | operating | 29 | Wind | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Smithfield Farmland Corp Bladen independent owner | Smithfield Fresh Meats Corp. | NC | operating | 29 | Oil | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TPC Windfarms LLC independent owner | Terra-Gen Operating Co-Wind | CA | operating | 29 | Wind | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wadham Energy independent owner | Wadham Energy LP | CA | operating | 29 | Other | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AES Kekaha Solar, LLC Hybrid independent owner | AES Distributed Energy | HI | operating | 28 | Battery storage | 2019 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.