Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 58 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Berlin Gorham independent owner | Great Lakes Hydro America LLC | NH | operating | 44 | Hydro | 1914 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Braswell Solar approvals pending | Gransolar Texas Nine LLC | TX | planned | 44 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cadillac Renewable Energy independent owner | Cadillac Renewable Energy LLC | MI | operating | 44 | Other | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Camino Solar Hybrid independent owner | Avangrid Power LLC | CA | operating | 44 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cartwright Solar I independent owner | Cartwright Solar I LLC | OR | operating | 44 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CD4 independent owner | CD4 | CA | operating | 44 | Other | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chicago Park independent owner | Nevada Irrigation District | CA | operating | 44 | Hydro | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coffeyville utility owner | City of Coffeyville - (KS) | KS | operating | 44 | Gas | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eklutna Hydro Project utility owner | Chugach Electric Assn Inc | AK | operating | 44 | Hydro | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flat Ridge Wind Energy LLC independent owner | Clearlight Energy Holdings LP | KS | operating | 44 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flying Cloud Power Partners LLC independent owner | Avangrid Power LLC | IA | operating | 44 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hudson Falls Hydroelectric Project independent owner | Boralex Hydro Operations Inc | NY | operating | 44 | Hydro | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hunlock Unit 4 independent owner | Hunlock Energy, LLC | PA | operating | 44 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | J Woodruff utility owner | USCE-Mobile District | FL | operating | 44 | Hydro | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lemolo 2 utility owner | PacifiCorp | OR | operating | 44 | Hydro | 1956 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oak Glen Wind Farm utility owner | Minnesota Municipal Power Agny | MN | operating | 44 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Packaging Corp. of America Jackson Mill independent owner | Boise White Paper LLC | AL | operating | 44 | Gas | 1996 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Riverbay independent owner | Riverbay Corp | NY | operating | 44 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rochester 5 utility owner | Rochester Gas & Electric Corp | NY | operating | 44 | Hydro | 1918 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ticona Polymers Inc independent owner | Ticona Polymers Inc | TX | operating | 44 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Waters River utility owner | City of Peabody - (MA) | MA | operating | 44 | Gas | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Willow Island Hydroelectric Plant utility owner | American Mun Power-Ohio, Inc | WV | operating | 44 | Hydro | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Graphic Packaging Gas interconnection agreement signed 2026-07; online expected 2027-02; request 26INR0111; financial security poste | — | McLennan Co., TX | planned | 43 | Gas | 2027 | ERCOT planned capacity changes |
| Power plant | Berry Placerita Cogen independent owner | Shadow Wolf Energy | CA | operating | 43 | Gas | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Combine Hills I independent owner | Eurus Combine Hills I LLC | OR | operating | 43 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dynegy Oakland Power Plant planned, approvals not started | Dynegy Oakland, LLC | CA | planned | 43 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Exelon Framingham LLC independent owner | Constellation Power, Inc | MA | operating | 43 | Oil | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | ExxonMobil Oil Joliet Refinery independent owner | ExxonMobil Oil Corp | IL | operating | 43 | Other | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | G McNeilus Wind Farm Dodge Center independent owner | Justin McNeilus | MN | operating | 43 | Wind | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gas Turbine (IA) utility owner | Cedar Falls Utilities | IA | operating | 43 | Gas | 1968 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | GPI WACO Power under construction | Graphic Packaging International - WACO | TX | planned | 43 | Gas | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Little Falls (WA) utility owner | Avista Corp | WA | operating | 43 | Hydro | 1910 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mass Inst Tech Cntrl Utilities/Cogen Plt independent owner | Massachusetts Inst of Tech | MA | operating | 43 | Gas | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nantahala utility owner | Duke Energy Carolinas, LLC | NC | operating | 43 | Hydro | 1942 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Passadumkeag Windpark LLC independent owner | Southern Power Co | ME | operating | 43 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Plainfield Renewable Energy LLC independent owner | Plainfield Renewable Energy, LLC | CT | operating | 43 | Other | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Purdue University independent owner | Purdue University | IN | operating | 43 | Gas | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Gorgonio Westwinds II LLC independent owner | Terra-Gen Operating Co-Wind | CA | operating | 43 | Wind | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Station H utility owner | City of Independence - (MO) | MO | operating | 43 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Steubenville Solar planned, approvals not started | BQ Energy Development | OH | planned | 43 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Toketee Falls utility owner | PacifiCorp | OR | operating | 43 | Hydro | 1949 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Voyager Wind III independent owner | Terra-Gen Operating Co-Wind | CA | operating | 43 | Wind | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Albeni Falls utility owner | USACE Northwestern Division | ID | operating | 42 | Hydro | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Belleville Dam utility owner | American Mun Power-Ohio, Inc | WV | operating | 42 | Hydro | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Berlin 5 utility owner | Green Mountain Power Corp | VT | operating | 42 | Oil | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carthage utility owner | City of Carthage - (MO) | MO | operating | 42 | Gas | 1946 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cerro Gordo Wind Farm independent owner | Cerro Gordo Wind Farm | IA | operating | 42 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Edison Sault utility owner | Cloverland Electric Co-op | MI | operating | 42 | Hydro | 1901 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fairbanks utility owner | Golden Valley Elec Assn Inc | AK | operating | 42 | Oil | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fernandina Plant independent owner | Rayonier Advanced Materials | FL | operating | 42 | Other | 1950 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fishing Creek utility owner | Duke Energy Carolinas, LLC | SC | operating | 42 | Hydro | 1916 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FL Solar 4, LLC independent owner | Onward Energy | FL | operating | 42 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Forbestown utility owner | South Feather Water and Power Agency | CA | operating | 42 | Hydro | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hawkeye Power Partners LLC independent owner | Hawkeye Power Partners LLC | IA | operating | 42 | Wind | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Industrial Plant utility owner | Alaska Electric Light & Power Co. | AK | operating | 42 | Oil | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | La Luz Energy Center utility owner | Public Service Co of NM | NM | operating | 42 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mars Hill Wind Farm Project independent owner | Evergreen Wind, LLC | ME | operating | 42 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Murray Turbine utility owner | City of Murray - (UT) | UT | operating | 42 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Salt Springs utility owner | Pacific Gas & Electric Co. | CA | operating | 42 | Hydro | 1931 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shepherd's Run Solar planned, approvals not started | Shepherd's Run Solar | NY | planned | 42 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shoemaker independent owner | Alliance NYGT, LLC | NY | operating | 42 | Gas | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Silver Sage Windpower independent owner | Deriva Energy | WY | operating | 42 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Denmark under construction, over half done | SR Denmark, LLC | TN | planned | 42 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sweatt utility owner | Mississippi Power Co | MS | operating | 42 | Gas | 1971 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sycamore (WI) utility owner | Madison Gas & Electric Co | WI | operating | 42 | Gas | 1967 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sycamore Solar utility owner | Dominion Energy Inc. | VA | operating | 42 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Teche utility owner | Cleco Power LLC | LA | operating | 42 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ticonderoga Mill independent owner | Sylvamo North America LLC | NY | operating | 42 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tuckertown Hydro utility owner | Eagle Creek Renewable Energy, LLC | NC | operating | 42 | Hydro | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Whitney utility owner | USACE-Fort Worth District | TX | operating | 42 | Hydro | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alcova utility owner | U S Bureau of Reclamation | WY | operating | 41 | Hydro | 1955 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Beaverdam Renewable Energy Center utility owner | Duke Energy Carolinas, LLC | SC | operating | 41 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bellows Falls independent owner | Great River Hydro, LLC | VT | operating | 41 | Hydro | 1928 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cabazon Wind Partners independent owner | Shell Wind Energy Inc. | CA | operating | 41 | Wind | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Corpus Christi independent owner | Equistar Chemicals LP | TX | operating | 41 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Elk Wind Farm independent owner | Greenbacker Renewable Energy Corporation | IA | operating | 41 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Genesee Solar Project independent owner | Genesee Solar Energy, LLC | MI | operating | 41 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Haefling utility owner | Kentucky Utilities Co | KY | operating | 41 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Indianola utility owner | Indianola Municipal Utilities - (IA) | IA | operating | 41 | Oil | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Langdon Wind Energy Center utility owner | Otter Tail Power Co | ND | operating | 41 | Wind | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Langdon Wind II LLC independent owner | FPL Energy Langdon Wind LLC | ND | operating | 41 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Fork utility owner | Portland General Electric Co | OR | operating | 41 | Hydro | 1958 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | OCI Alamo Solar I Hybrid independent owner | OCI Energy LLC | TX | operating | 41 | Solar | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oregon Trail Solar under construction | Avangrid Power LLC | OR | planned | 41 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Robin Hollow Solar independent owner | Robin Hollow Solar, LLC | RI | operating | 41 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shutler Energy Storage under construction | Avangrid Power LLC | OR | planned | 41 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sonoco Products Co independent owner | Sonoco Products Co | SC | operating | 41 | Other | 1947 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Dakota Wind Energy Cente independent owner | FPL Energy South Dakota Wind LLC | SD | operating | 41 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TPW Petersburg independent owner | TPW Petersburg LLC | NE | operating | 41 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | University of Iowa Main Power Plant independent owner | University of Iowa | IA | operating | 41 | Gas | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | WE Soda Alkalai LLC independent owner | WE Soda Alkali | WY | operating | 41 | Coal | 1953 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | AES Lawai Solar Hybrid independent owner | AES Distributed Energy | HI | operating | 40 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anderson Ranch utility owner | U S Bureau of Reclamation | ID | operating | 40 | Hydro | 1950 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Apache Solar I utility owner | Arizona Electric Pwr Coop Inc | AZ | operating | 40 | Battery storage | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Battery Energy Storage System utility owner | Golden Valley Elec Assn Inc | AK | operating | 40 | Battery storage | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Biomass One LP independent owner | Biomass One LP | OR | operating | 40 | Other | 1985 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bird Dog Solar independent owner | Bird Dog Solar, LLC | GA | operating | 40 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Mesa BESS utility owner | Idaho Power Co | ID | operating | 40 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Black Mesa Solar, LLC independent owner | Black Mesa Solar, LLC | ID | operating | 40 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bluegrass Solar independent owner | MN8 Energy LLC | MD | operating | 40 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.