Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 56 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Maiden Creek Battery under construction | Duke Energy Carolinas, LLC | NC | planned | 50 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MC Solar under construction | MC Solar, LLC | PA | planned | 50 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McGrath Peaker utility owner | Southern California Edison Co | CA | operating | 50 | Gas | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Midway Solar Farm 1 independent owner | 83WI 8ME, LLC | CA | operating | 50 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mills Solar Project under construction | MidAmerican Energy Co | IA | planned | 50 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Milo Wind Project LLC independent owner | Boralex US Operations LLC | NM | operating | 50 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mira Loma Peaker utility owner | Southern California Edison Co | CA | operating | 50 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Moraine II Wind LLC independent owner | Avangrid Power LLC | MN | operating | 50 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Napoleon Peaking Station utility owner | American Mun Power-Ohio, Inc | OH | operating | 50 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | NMRD Data Center III, LLC independent owner | Exus New Mexico | NM | operating | 50 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Johnson Energy Center independent owner | Wellhead Services, Inc | CA | operating | 50 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Rock utility owner | Wisconsin Power & Light Co | WI | operating | 50 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Orion - Helion approvals pending | Helion Energy, Inc. | WA | planned | 50 | Other | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Osceola Windpower II independent owner | Osceola Windpower II | IA | operating | 50 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Padua 1 independent owner | Padua 1 | TX | operating | 50 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Panton approvals pending | Viridis Solar | VT | planned | 50 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Partin Solar independent owner | Partin Solar, LLC | NC | operating | 50 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pavant Solar II LLC independent owner | Pavant Solar II LLC | UT | operating | 50 | Solar | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pavant Solar, LLC independent owner | Onward Energy | UT | operating | 50 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pearl Solar independent owner | BHE Renewables, LLC | TX | operating | 50 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pitts Dudik Solar independent owner | Elawan Pitts Dudik Solar, LLC | TX | operating | 50 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pleasant Creek Unit 1 utility owner | Interstate Power and Light Co | IA | operating | 50 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pueblo Airport Generating Station approvals pending | Black Hills Service Company LLC | CO | planned | 50 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Puente Hills Energy Recovery independent owner | Los Angeles County Sanitation | CA | operating | 50 | Other | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quest Solar approvals received | Quest Solar | SC | planned | 50 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Raceway Solar under construction | Freepoint Commodities LLC | DE | planned | 50 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Reworld Niagara I independent owner | Reworld Niagara I, LLC | NY | operating | 50 | Other | 1980 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Richfield Solar Energy LLC independent owner | Invenergy Services LLC | MD | operating | 50 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Richwood Solar and Storage planned, approvals not started | Samsung C&T Renewables, LLC | OH | planned | 50 | Battery storage | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ridgely Energy Farm planned, approvals not started | Leeward Asset Management, LLC | TN | planned | 50 | Battery storage | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rippey Wind Farm independent owner | Greenbacker Renewable Energy Corporation | IA | operating | 50 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rockwood utility owner | Imperial Irrigation District | CA | operating | 50 | Gas | 1979 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Route 66 Energy Center, LLC independent owner | Route 66 Energy Center, LLC | NM | operating | 50 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Route 66 Energy Storage independent owner | Route 66 Energy Storage | NM | operating | 50 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ruby Solar, LLC under construction, over half done | Birch Creek Development | IL | planned | 50 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ryan Storage under construction | Ryan Storage LLC | TX | planned | 50 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Salt City Solar Project - Hybrid independent owner | Salt City Solar LLC | OH | operating | 50 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Salt Creek Township Solar, LLC independent owner | Birch Creek Power, LLC | IL | operating | 50 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Gorgonio Windplant WPP1993 independent owner | FPL Energy Operating Services, Inc. | CA | operating | 50 | Wind | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sandersville Solar approvals pending | Sandersville Solar, LLC | GA | planned | 50 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sandy Ridge Wind Farm independent owner | Algonquin Power Co | PA | operating | 50 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Schofield Generating Station utility owner | Hawaiian Electric Co Inc | HI | operating | 50 | Other | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SloughHouse Solar, LLC independent owner | SloughHouse Solar, LLC | CA | operating | 50 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SolaireHolman Solar Project independent owner | SolaireHolman 1, LLC | TX | operating | 50 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Solway Solar under construction | Otter Tail Power Co | MN | planned | 50 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | South Chestnut LLC independent owner | Avangrid Power LLC | PA | operating | 50 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Georgetown under construction, over half done | SR Georgetown. LLC | SC | planned | 50 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Mount Pleasant approvals received | SR Mount Pleasant, LLC | MS | planned | 50 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Puryear under construction | SR Puryear, LLC | TN | planned | 50 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Rochelle II approvals received | SR Rochelle II, LLC | GA | planned | 50 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Turkey Creek, LLC independent owner | SR Turkey Creek, LLC | KY | operating | 50 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stanly Solar, LLC independent owner | SunStrong Management | NC | operating | 50 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Steele Flats Energy Storage under construction, over half done | Steele Flats Energy Storage, LLC | NE | planned | 50 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sun Ridge Solar under construction, over half done | Sun Ridge Solar, LLC | VA | planned | 50 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunlight Road Solar independent owner | Sunlight Road Solar, LLC | LA | operating | 50 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunray Wind I independent owner | Diamond Shamrock Refining Company LP | TX | operating | 50 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Techren Solar V independent owner | Techren Solar V LLC | NV | operating | 50 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Timber Road Solar Park independent owner | Timber Road Solar Park | OH | operating | 50 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Titan Solar independent owner | Titan Solar, LLC | CO | operating | 50 | Solar | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tortolas independent owner | Engie North America | TX | operating | 50 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Troy Solar utility owner | Southern Indiana Gas & Elec Co | IN | operating | 50 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX11 Republic Road Storage independent owner | Key Capture Energy | TX | operating | 50 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX13 Endurance Park Storage independent owner | Key Capture Energy | TX | operating | 50 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX19 River Valley Storage 1 independent owner | Key Capture Energy | TX | operating | 50 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX21 River Valley Storage 2 independent owner | Key Capture Energy | TX | operating | 50 | Battery storage | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TX23 Roughneck Storage independent owner | Key Capture Energy | TX | operating | 50 | Battery storage | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Valero Refinery Cogeneration Unit 1 independent owner | Valero Refining Co California | CA | operating | 50 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vandalia Renewable Energy Center utility owner | Union Electric Co - (MO) | MO | operating | 50 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ventasso Energy Storage, LLC independent owner | RWE Clean Energy | CA | operating | 50 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Walnut utility owner | Turlock Irrigation District | CA | operating | 50 | Gas | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Whitehorn Solar independent owner | Whitehorn Solar, LLC | VA | operating | 50 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wilton Wind II LLC independent owner | Wilton Wind II LLC | ND | operating | 50 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Winston utility owner | City of Lakeland - (FL) | FL | operating | 50 | Oil | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Woodville Renewable Power Project utility owner | East Texas Electric Coop, Inc | TX | operating | 50 | Other | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yuba City Cogen Partners independent owner | Wellhead Services, Inc | CA | operating | 50 | Gas | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clearwater Power Plant utility owner | City of Riverside - (CA) | CA | operating | 49 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Clewiston Sugar House independent owner | United States Sugar Corp | FL | operating | 49 | Other | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cuyamaca Peak Energy Plant utility owner | San Diego Gas & Electric Co | CA | operating | 49 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Drum 1 utility owner | Pacific Gas & Electric Co. | CA | operating | 49 | Hydro | 1913 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | E F Oxnard Energy Facility independent owner | EF Oxnard, LLC | CA | operating | 49 | Gas | 1990 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Highest Power Solar, LLC independent owner | SunStrong Management | NC | operating | 49 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kawailoa Solar independent owner | Kawailoa Solar, LLC | HI | operating | 49 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kern River Eastridge Cogen independent owner | Chevron USA Inc | CA | operating | 49 | Gas | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kings River PH utility owner | Pacific Gas & Electric Co. | CA | operating | 49 | Hydro | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lost Creek utility owner | USACE Northwestern Division | OR | operating | 49 | Hydro | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Minnesota River utility owner | Minnesota Municipal Power Agny | MN | operating | 49 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Montpelier Solar Project independent owner | Montpelier Solar, LLC | OH | operating | 49 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mountain View IV independent owner | AES Distributed Energy | CA | operating | 49 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Overton Hydroelectric Project planned, approvals not started | Rye Development | LA | planned | 49 | Hydro | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quinebaug Solar independent owner | Quinebaug Solar, LLC | CT | operating | 49 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sanford Solar independent owner | Sanford Airport Solar, LLC | ME | operating | 49 | Solar | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Santa Ynez Facility independent owner | Sable Offshore Corp | CA | operating | 49 | Gas | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sterlington Solar utility owner | Entergy Louisiana LLC | LA | operating | 49 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Torrance Refining Company, LLC independent owner | Torrance Refining Company, LLC | CA | operating | 49 | Other | 1983 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Alabama River Pulp independent owner | Alabama River Cellulose LLC | AL | operating | 48 | Other | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ashtabula Wind Energy Center utility owner | Otter Tail Power Co | ND | operating | 48 | Wind | 2008 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CM48 independent owner | RWE Clean Energy | NV | operating | 48 | Solar | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Consumer Operations LLC independent owner | Georgia-Pacific Consumer Oper. Green Bay LLC | WI | operating | 48 | Gas | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Creed Energy Center independent owner | Creed Energy Center LLC | CA | operating | 48 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Eden Solar LLC independent owner | AES Distributed Energy | NC | operating | 48 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.