Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 51 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Mountaineer Wind Energy Center independent owner | Sequitur Renewables, LLC | WV | operating | 66 | Wind | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Natchez utility owner | Entergy Mississippi LLC | MS | retired | 66 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Roseville Power Plant #2 utility owner | City of Roseville - (CA) | CA | operating | 66 | Gas | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Francisquito 1 utility owner | Los Angeles Department of Water & Power | CA | operating | 66 | Hydro | 1917 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Saratoga Wind Farm utility owner | Madison Gas & Electric Co | IA | operating | 66 | Wind | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR Durhamville approvals received | SR Durhamville, LLC | TN | planned | 66 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Westrock Hodge (LA) independent owner | Westrock (LA) | LA | operating | 66 | Other | 1957 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wheelabrator South Broward independent owner | FCC Environmental | FL | operating | 66 | Other | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | World Generation X independent owner | North American Energy Services | NY | operating | 66 | Gas | 1993 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Air Products Texas City independent owner | Air Products & Chemicals Inc | TX | operating | 65 | Other | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Breckinridge Energy Storage independent owner | Breckinridge Energy Storage LLC | OK | operating | 65 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bushy Park Combustion Turbine Facility utility owner | Dominion Energy South Carolina, Inc | SC | operating | 65 | Gas | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cimarron River utility owner | Sunflower Electric Power Corp | KS | operating | 65 | Gas | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Crystal Hill Solar independent owner | Urban Grid Solar | VA | operating | 65 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | D G Hunter utility owner | City of Alexandria - (LA) | LA | operating | 65 | Gas | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gianera utility owner | City of Santa Clara - (CA) | CA | operating | 65 | Gas | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hawtree Solar independent owner | Hawtree Creek Farm Solar, LLC | NC | operating | 65 | Solar | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | International Paper Texarkana Mill independent owner | Graphic Packaging International - Texarkana | TX | operating | 65 | Other | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kingdom Community Wind utility owner | Green Mountain Power Corp | VT | operating | 65 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Luke Mill independent owner | Verso Luke LLC | MD | retired | 65 | Coal | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Melsam Solar approvals received | Melsam Solar | SC | planned | 65 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Minco II Energy Storage independent owner | Minco II Energy Storage LLC | OK | operating | 65 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MMWEC Simple Cycle Gas Turbine utility owner | Massachusetts Mun Wholes Electric Co | MA | operating | 65 | Gas | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mossy Branch Battery Facility utility owner | Georgia Power Co | GA | operating | 65 | Battery storage | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Newark Power Plant independent owner | Calpine Newark LLC | NJ | retired | 65 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northumberland Solar independent owner | Northumberland Solar, LLC | PA | operating | 65 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Paddock Solar utility owner | Wisconsin Power & Light Co | WI | operating | 65 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Point Wind independent owner | Terra-Gen Operating Co-Wind | CA | operating | 65 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Poseidon Wind, LLC independent owner | Axium Arizona Renewables, LLC | AZ | operating | 65 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Primient Decatur Plant Cogen independent owner | Primary Products Ingredients Americas, LLC | IL | operating | 65 | Gas | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | RE Gaskell West 2 LLC independent owner | RE Gaskell West LLC | CA | operating | 65 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | San Jacinto Grid, LLC independent owner | San Jacinto Grid, LLC | CA | operating | 65 | Battery storage | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shoe Creek Solar, LLC independent owner | Cypress Creek Renewables | NC | operating | 65 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | SR DeSoto II independent owner | SR DeSoto II, LLC | GA | operating | 65 | Solar | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sterling Power Plant independent owner | Sterling Power Partners LP | NY | operating | 65 | Gas | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sunflower Sky Energy Center under construction, over half done | Evergy Missouri West | KS | planned | 65 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Warsaw Farm utility owner | Duke Energy Progress - (NC) | NC | operating | 65 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Waymart Wind independent owner | Sequitur Renewables, LLC | PA | operating | 65 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wheelabrator Baltimore Refuse independent owner | Wheelabrator Environmental Systems | MD | operating | 65 | Other | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Whitney Hill Wind Power LLC independent owner | Whitney Hill Wind Power LLC | IL | operating | 65 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Wolverine Creek independent owner | Invenergy Services LLC | ID | operating | 65 | Wind | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chanute 2 utility owner | City of Chanute (KS) | KS | operating | 64 | Gas | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Falls independent owner | Constellation Power, Inc | PA | operating | 64 | Oil | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jones Farm Solar independent owner | Urban Grid Solar | MD | operating | 64 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | LaGrande utility owner | City of Tacoma - (WA) | WA | operating | 64 | Hydro | 1912 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mormon Flat utility owner | Salt River Project | AZ | operating | 64 | Hydro | 1926 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Moser Generating Station independent owner | Constellation Power, Inc | PA | operating | 64 | Oil | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sigel Wind Park utility owner | DTE Electric Company | MI | operating | 64 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Superior utility owner | DTE Electric Company | MI | operating | 64 | Oil | 1966 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TalenEnergy Martin Creek LLC Allentown independent owner | TalenEnergy Martins Creek LLC | PA | retired | 64 | Oil | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TalenEnergy Martins Creek LLC Harrisburg independent owner | TalenEnergy Martins Creek LLC | PA | retired | 64 | Oil | 2022 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Argus Cogen Plant independent owner | Searles Valley Minerals Operations Inc. | CA | operating | 63 | Coal | 1947 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cambria Wind LLC independent owner | Exus Pennsylvania Wind Holdings | PA | operating | 63 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carthage Energy LLC independent owner | Carthage Energy LLC | NY | operating | 63 | Gas | 1991 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dry Lake Wind LLC independent owner | Avangrid Power LLC | AZ | operating | 63 | Wind | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Fair Station utility owner | Central Iowa Power Cooperative | IA | retired | 63 | Coal | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | James De Young utility owner | City of Holland - (MI) | MI | retired | 63 | Coal | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Madison Solar (VA) independent owner | AES Clean Energy | VA | operating | 63 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mesquite Solar 4, LLC independent owner | RWE Clean Energy | AZ | operating | 63 | Solar | 2024 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Morony utility owner | NorthWestern Energy (MT Hydro) | MT | operating | 63 | Hydro | 1930 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Point Comfort Operations independent owner | Alcoa World Alumina LLC | TX | retired | 63 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Spring Canyon Expansion Wind Energy Ctr independent owner | Spring Canyon Expansion LLC | CO | operating | 63 | Wind | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Yuma Cogeneration Associates independent owner | Falcon Power Operating Company | AZ | operating | 63 | Gas | 1994 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Algonquin Power Sanger LLC independent owner | Clearlight Energy Sanger LLC | CA | operating | 62 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ashtabula Wind III LLC utility owner | Otter Tail Power Co | ND | operating | 62 | Wind | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Biron Mill independent owner | ND Paper, Inc. | WI | operating | 62 | Coal | 1947 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cabot independent owner | FirstLight Power Resources, Inc. - MA | MA | operating | 62 | Hydro | 1915 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cerulean Solar under construction, over half done | Dominion Renewable Energy | VA | planned | 62 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Consumer Operations LLC independent owner | Georgia-Pacific Consumer Operations (Camas) LLC | WA | retired | 62 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | DeRidder Mill independent owner | Packaging Corporation of America | LA | operating | 62 | Other | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | FPL Energy North Dakota Wind I/II independent owner | FPL Energy North Dakota Wind LLC | ND | operating | 62 | Wind | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Placid Solar Power Plant utility owner | Duke Energy Florida, LLC | FL | operating | 62 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Latigo Wind Park independent owner | AES Distributed Energy | UT | operating | 62 | Wind | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lemon Creek utility owner | Alaska Electric Light & Power Co. | AK | operating | 62 | Oil | 1969 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Marshall Solar Energy Project independent owner | Marshall Solar Energy Project | MN | operating | 62 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Nippon Dynawave Packaging Longview WA independent owner | Nippon Dynawave Packaging Co. | WA | operating | 62 | Other | 1948 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | North Star Solar independent owner | Southern Power Co | CA | operating | 62 | Solar | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northeast (WA) utility owner | Avista Corp | WA | operating | 62 | Gas | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Palm Beach Renewable Energy Facility 1 independent owner | Solid Waste Authority of Palm Beach Co | FL | operating | 62 | Other | 1989 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Primient independent owner | Primary Products Ingredients Americas, LLC d/b/a Primient | IN | operating | 62 | Gas | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Summit Farms Solar independent owner | Dominion Renewable Energy | NC | operating | 62 | Solar | 2017 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Whitewater Hill Wind Partners independent owner | Shell Wind Energy Inc. | CA | operating | 62 | Wind | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Honeycomb Solar SLF interconnection agreement signed 2023-05; online expected 2027-02; request 22INR0559; financial security poste | — | Bee Co., TX | planned | 61 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Orange Grove BESS interconnection agreement signed 2022-11; online expected 2027-04; request 23INR0331; financial security poste | — | Jim Wells Co., TX | planned | 61 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Agua Mansa Power Plant utility owner | E I Colton LLC | CA | operating | 61 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bayswater Peaking Facility LLC independent owner | Bayswater Peaking Facility LLC | NY | operating | 61 | Other | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CalPeak Power Panoche Peaker Plant independent owner | CalPeak Power, LLC | CA | operating | 61 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | CalPeak Power Vaca Dixon Peaker Plant independent owner | CalPeak Power, LLC | CA | operating | 61 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cirrus Wind 1 LLC independent owner | Cirrus Wind 1 LLC | TX | operating | 61 | Wind | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Coachella Hills Wind independent owner | Terra-Gen Operating Co-Wind | CA | operating | 61 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Columbia (MO) utility owner | City of Columbia - (MO) | MO | operating | 61 | Gas | 1963 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Delano Energy Center independent owner | Wellhead Services, Inc | CA | operating | 61 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Cajon Energy Center independent owner | Wellhead Services, Inc | CA | operating | 61 | Gas | 2010 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | George Birdsall utility owner | City of Colorado Springs - (CO) | CO | retired | 61 | Gas | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Grange Hall Solar utility owner | Tampa Electric Co | FL | operating | 61 | Solar | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Island Street Peaking Plant utility owner | WPPI Energy | WI | operating | 61 | Gas | 2004 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Jamaica Bay Peaking independent owner | Jamaica Bay Peaking Facility, LLC | NY | operating | 61 | Oil | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kalkaska CT #1 utility owner | Michigan Public Power Agency | MI | operating | 61 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake One utility owner | City of Burbank Water and Power - (CA) | CA | operating | 61 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Laurel Oaks Solar utility owner | Tampa Electric Co | FL | operating | 61 | Solar | 2022 | U.S. Energy Information Administration, Form EIA-860M |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.