Known data centers and power projects, with the source on every row.

A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.

11,405 results, page 108 of 115. Biggest first.

TypeNameOwnerWhereStatusMWFuelYearSource
Data centerRobena Data CenterInternational Electric Power of PittsburghPA (city-level)existing or reported———ATLAS data center map
Data centerRochester
28 Mansfield Street 14606 Rochester United States
CentriLogicNY (city-level)existing or reported———ATLAS data center map
Data centerRochester (Chestnut Street)
100 Chestnut St 14604 Rochester USA
FirstLightNY (city-level)existing or reported———ATLAS data center map
Data centerRochester (Exchange Street)
1 Exchange Blvd 14614-2002 Rochester USA
FirstLightNY (city-level)existing or reported———ATLAS data center map
Data centerRochester (Fitzhugh Street)
95 Fitzhugh St N 14614-1212 Rochester USA
Frontier Communications CorporationNY (city-level)existing or reported———ATLAS data center map
Data centerRochester (Mile Crossing Boulevard)
150 Mile Crossing Blvd 14624-6209 Rochester USA
CenturyLinkNY (city-level)existing or reported———ATLAS data center map
Data centerRock Hill
471 Lakeshore Parkway SC 29730 Rock Hill United States
ImmedionSC (city-level)existing or reported———ATLAS data center map
Data centerRock House Road Data Center SiteTaylor Mathis / c/o Mike IrbyGA (city-level)existing or reported———ATLAS data center map
Data centerRockdale Technology Park 1SDP AcquisitionsGA (city-level)existing or reported———ATLAS data center map
Data centerRockland Data Center
1050 Hingham Street MA 02370 Rockland United States
ColoSpaceMA (city-level)existing or reported———ATLAS data center map
Data centerRockledge
5430 Village Drive FL Rockledge United States
ndtArtemisFL (city-level)existing or reported———ATLAS data center map
Data centerRockville
12358 Parklawn Drive Rockville United States
Greencourt GroupNY (city-level)existing or reported———ATLAS data center map
Data centerRocky Mountain Research Data Center
80309 Boulder USA +1 (303) 735-6637
University of ColoradoCO (city-level)existing or reported———ATLAS data center map
Data centerRockyNet Inc. Boulder
382 S. Arthur Ave 80027 Louisville United States
RockyNet Inc.CO (city-level)existing or reported———ATLAS data center map
Data centerRockyNet Inc. Denver
1050 Seventeenth Street 80265 Denver United States
RockyNet Inc.CO (city-level)existing or reported———ATLAS data center map
Data centerRomulus (Seneca Army Depot)
Seneca Army Depot 14541 Romulus USA
FirstLightNY (city-level)existing or reported———ATLAS data center map
Data centerRoosevelt BuildingYOSEMITE DC ASSETS LLCVA (city-level)existing or reported———ATLAS data center map
Data centerRosemount Data CenterMetaMN (city-level)existing or reported———ATLAS data center map
Data centerRowan Cinco Data CenterRowan Digital InfrastructureTX (city-level)existing or reported———ATLAS data center map
Data centerRowan Temple Data CenterRowan Digital InfrastructureTX (city-level)existing or reported———ATLAS data center map
Data centerRoxbury Technology ParkDiode VenturesVA (city-level)existing or reported———ATLAS data center map
Data centerRT 3811
3811 West 12 Mile Road 48072 Berkley United States
RT Software Systems, Inc.MI (city-level)existing or reported———ATLAS data center map
Data centerRubicon Data Centers
Reno NV Reno United States
Rubicon Data CentersNV (city-level)existing or reported———ATLAS data center map
Data centerRumble Technology ParkRum Creek DevCoGA (city-level)existing or reported———ATLAS data center map
Data centerRutherford
284 Social Circle, Old Caroleen Road NC 28043 Forest City United States
FacebookNC (city-level)existing or reported———ATLAS data center map
Data centerSabey Ashburn Building ASabeyVA (city-level)existing or reported———ATLAS data center map
Data centerSabey Austin Data CenterSabeyTX (city-level)existing or reported———ATLAS data center map
Data centerSabey Butte Data CenterSabeyMT (city-level)existing or reported———ATLAS data center map
Data centerSabey Indianapolis Data CenterSabeyIN (city-level)existing or reported———ATLAS data center map
Data centerSacramento
10980 Gold Center Drive, Building C, Suite C-300 CA 95670 Rancho Cordova United States
EdgeConneXCA (city-level)existing or reported———ATLAS data center map
Data centerSacramento
1100 North Market Blvd CA 95834 Sacramento United States
Quality Technology Services (QTS)CA (city-level)existing or reported———ATLAS data center map
Data centerSacramento
1075 Triangle Ct 95605-2778 West Sacramento USA
CenturyLinkCA (city-level)existing or reported———ATLAS data center map
Data centerSacramento (AK Street)
2407 Ak St 95652-2529 McClellan Park USA
Prime Data CentersCA (city-level)existing or reported———ATLAS data center map
Data centerSacramento 1
1200 Striker Ave CA 95834 Sacramento United States
RagingWireCA (city-level)existing or reported———ATLAS data center map
Data centerSacramento 2
1312 Striker Ave CA 95834 Sacramento United States
RagingWireCA (city-level)existing or reported———ATLAS data center map
Data centerSacramento 3
1625 W National Dr 95834 Sacramento USA
RagingWireCA (city-level)existing or reported———ATLAS data center map
Data centerSafeHouse Datacenter
9813 Dawson Creek Blvd 46825 Fort Wayne United States
SafeHouse DatacenterIN (city-level)existing or reported———ATLAS data center map
Data centerSago Networks Atlanta
4311 Communications Drive 30093 Norcross United States
SAGO Networks, LLC.GA (city-level)existing or reported———ATLAS data center map
Data centerSago Networks Tampa
4465 W. Gandy Blvd 33611 Tampa United States
SAGO Networks, LLC.FL (city-level)existing or reported———ATLAS data center map
Data centerSailfish Comanche CircleSailfish Digital VenturesTX (city-level)existing or reported———ATLAS data center map
Data centerSalt Lake City
8871 Sandy Pkwy W, 1st floor 84070 Sandy USA
XO CommunicationsUT (city-level)existing or reported———ATLAS data center map
Data centerSalt Lake City
5035 Harold Gatty Dr 84116 Salt Lake City USA
CenturyLinkUT (city-level)existing or reported———ATLAS data center map
Data centerSalt Lake City Metro Data Center
1145 South 800 East 84097 Orem USA
FibernetUT (city-level)existing or reported———ATLAS data center map
Data centerSAMX Data CenterSAMX DataVA (city-level)existing or reported———ATLAS data center map
Data centerSan Angelo POP
7 W Twohig Ave 76903 San Angelo USA
Crown CastleTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio
5150 Rogers Road 78251-3660 San Antonio United States
MicrosoftTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio
5128 Service Ctr TX 78218 San Antonio United States
Nugget NetworksTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio
5308 Distribution Dr 78218 San Antonio United States
XO CommunicationsTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio
911 N Frio St 78207-1809 San Antonio USA
SiteB DataTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio (Ramsey Road)
214 E Ramsey Rd 78216 San Antonio USA
CenturyLinkTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio (Service Center Drive)
5130 Service Center Dr, Suite 104 78218 San Antonio USA
CenturyLinkTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio (Taylor Street)
100 Taylor St, Suite 301 78205 San Antonio USA
VTX1 CompaniesTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio (Walsh Road)
2675 Walsh Rd 78224 San Antonio USA
VTX1 CompaniesTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio 1
Westover Hills Boulevard 9999 78251 San Antonio United States
CyrusOneTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio 2
Westover Hills Boulevard 9554 78251 San Antonio United States
CyrusOneTX (city-level)existing or reported———ATLAS data center map
Data centerSan Antonio 2 - Westover Hills
9550 Westover Hills Blvd 78251 San Antonio USA
Stream Data CentersTX (city-level)existing or reported———ATLAS data center map
Data centerSan Clemente
1009 Calle Sombra 92673-6244 San Clemente USA
NDC HostCA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego
5761 Copley Drive, Suite B CA 92111 San Diego United States
EdgeConneXCA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego
5771 Copley Dr, 1st floor 92111-7912 San Diego USA
XO CommunicationsCA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego
8830 Complex Dr 92123 San Diego USA
I2B NetworksCA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego
3180 University Ave 92104 San Diego USA
BBG CommunicationsCA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego
5732 Pacific Center Blvd 92121 San Diego USA
Brookfield Infrastructure Partners LPCA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego (Aero Drive)
8829 Aero Dr 92123 San Diego USA
CenturyLinkCA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego (B Street)
535 B St 92101 San Diego USA
Cogent Communications Inc.CA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego (Town Centre Drive)
9530 Towne Centre Dr 92121 San Diego USA
Cogent Communications Inc.CA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego Supercomputer Center - UCSD
10100 Hopkins Dr 92121 San Diego USA
The Regents of the University of CaliforniaCA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego Tech Center
9725 Scranton Road 92121 San Diego United States
American Internet Services (AIS)CA (city-level)existing or reported———ATLAS data center map
Data centerSan Diego World Trade Data Center: SAN1DataBankCA (city-level)existing or reported———ATLAS data center map
Data centerSan Francisco
400 Paul Ave 94124-3125 San Francisco USA
fifteenfortyseven Critical Systems Realty (1547)CA (city-level)existing or reported———ATLAS data center map
Data centerSan Francisco
200 Paul Ave, Suite 401 94124 San Francisco USA
CenturyLinkCA (city-level)existing or reported———ATLAS data center map
Data centerSan Francisco
2820 Northwestern Pkwy 95051-0904 Santa Clara USA
Atlantic.NetCA (city-level)existing or reported———ATLAS data center map
Data centerSan Francisco (Brannan St.)
651 Brannan St, 3rd floor 94107-1535 San Francisco USA
XO CommunicationsCA (city-level)existing or reported———ATLAS data center map
Data centerSan Francisco 2
N/A 94103 San Francisco United States
Digital OceanCA (city-level)existing or reported———ATLAS data center map
Data centerSan Francisco DC 1
200 Paul St., suite 400 94110 San Francisco United States
Colocation AmericaCA (city-level)existing or reported———ATLAS data center map
Data centerSan Jose
5201 Great America Pkwy 95054 San Jose United States
Dimension DataCA (city-level)existing or reported———ATLAS data center map
Data centerSan Jose
2030 Fortune Dr 95131-1835 San Jose USA
H5 Data CenterCA (city-level)existing or reported———ATLAS data center map
Data centerSan Jose
534 Stockton Ave 95126-2430 San Jose USA
EvocativeCA (city-level)existing or reported———ATLAS data center map
Data centerSan Jose
55 S Market St 95113 San Jose USA
ColoCrossingCA (city-level)existing or reported———ATLAS data center map
Data centerSan Jose
400 Holger Way 95134-1368 San Jose USA
Brookfield Infrastructure Partners LPCA (city-level)existing or reported———ATLAS data center map
Data centerSan Jose (Silicon Valley)
55 South Market, Suite 205 95113 San Jose United States
Hurricane ElectricCA (city-level)existing or reported———ATLAS data center map
Data centerSan Jose 1
9 Great Oaks Blvd 95119 San Jose USA
ZenlayerCA (city-level)existing or reported———ATLAS data center map
Data centerSan Jose Live / Shopping Mall Colo
150 S 1st St 95113 San Jose United States
DatapipeCA (city-level)existing or reported———ATLAS data center map
Data centerSan Luis Obispo
3610 Sacramento Dr 93401 San Luis Obispo USA
H5 Data CenterCA (city-level)existing or reported———ATLAS data center map
Data centerSan Marcos
401 Carlson Cir 78666-6730 San Marcos USA
Grande Communications Networks LLCTX (city-level)existing or reported———ATLAS data center map
Data centerSan Ramon Workgroup
2481 Deerwood Dr CA 94583 San Ramon United States
SungardCA (city-level)existing or reported———ATLAS data center map
Data centerSand Springs Data Center—OK (city-level)existing or reported———ATLAS data center map
Data centerSangha West Texas SiteSangha RenewablesTX (city-level)existing or reported———ATLAS data center map
Data centerSanta Ana
1924 E Deere Ave 92705-5723 Santa Ana USA
XO CommunicationsCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Barbara
104 West Anapamu Street 93101 Santa Barbara United States
Impulse Advanced CommunicationsCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara
2151 Mission College Boulevard 95054 Santa Clara United States
INAP (Internap Corporation)CA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara
3030 Corvin Dr 95051 Santa Clara United States
TerremarkCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara
3075 Raymond St 95054-3431 Santa Clara USA
Electric LightwaveCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara
1700 Richard Ave 95050-2851 Santa Clara USA
EdgeConneXCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara
2050 Martin Ave 95050-2702 Santa Clara USA
vXchngeCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara
39800 Eureka Dr 94560-4809 Newark USA
VerizonCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara 1
2807 Mission College Blvd 95054 Santa Clara United States
Quality Technology Services (QTS)CA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara 2
2805 Mission College Blvd CA 95054 Santa Clara United States
Quality Technology Services (QTS)CA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara 2
1350 Duane Ave 95054-3413 Santa Clara USA
Stream Data CentersCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara 3
870 Duane Ave 95054-3410 Santa Clara USA
Stream Data CentersCA (city-level)existing or reported———ATLAS data center map
Data centerSanta Clara 4
3075 Raymond St 95054-3431 Santa Clara USA
Stream Data CentersCA (city-level)existing or reported———ATLAS data center map

Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.

Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.

Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.