Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 105 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Data center | Perimeter Technology Oklahoma City #2 4121 Perimeter Center Place 73112 Oklahoma City United States | Perimeter Technology | OK (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Perimeter Technology Tulsa 322 E. Archer 74120 Tulsa United States | Perimeter Technology | OK (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Person County Mega Park Data Center | Microsoft | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Perspecta Datacenter Campus | Amazon | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Petawatt Massena Data Center | Petawatt Holdings | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Peterson Stafford Data Center | Stack Infrastructure | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pheonix 2500 W Union Hills Dr 85027 Phoenix USA | Aligned Energy | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia 3701 Market Street, 5th floor 19177 Philadelphia United States | 365 Data Centers | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia 401 N Broad Street 19123 Philadelphia United States | CenturyLink | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia 1000 Black Rock Rd 19460-3192 Phoenixville USA | Flexential | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia 4775 League Island Blvd 19112-1220 Philadelphia USA | TierPoint | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia 1500 Spring Garden St 19130 Philadelphia USA | vXchnge | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia (Locust St.) 2401 Locust St, 3rd floor 19103-5416 Philadelphia USA | XO Communications | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia (N. Broad St.) 401 N Broad St, 4th floor, Suite 480 19108 Philadelphia USA | XO Communications | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia (North Broad Street) 401 N Broad St 19108 Philadelphia USA | CenturyLink | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia Data Center 1 9999 Hamilton Blvd, Unit 4 18031 Breinigsville USA | Colocation America | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia Data Center 2 1000 Adams Ave 19403-2402 Eagleville USA | Colocation America | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philadelphia Data Center 3 3949 Schelden Cir 18017-8936 Bethlehem USA | Colocation America | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Philcade Data Center 501 South Boston 74103 Tulsa United States | Kanbar Properties KPM | OK (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix 2600 W Germann Rd AZ 85286 Chandler United States | H5 Data Center | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix 3011 S 52nd Street, Suite 107 AZ 85282 Tempe United States | EdgeConneX | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix 3110 N. Central Ave, Suite B75 85012 Phoenix United States | CoreLink | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix 1710 E Grant St 85034 Phoenix USA | Windstream Services, LLC | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix 1850 W Deer Valley Rd 85027-2124 Phoenix USA | Flexential | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix 2121 S Price Rd 85286-7205 Chandler USA | INAP (Internap Corporation) | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix 615 N 48th St 85008-6608 Phoenix USA | Iron Mountain | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix - El Mirage | Compass Datacenters | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix - Goodyear | Compass Datacenters | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix (3930 E. Watkins) 3930 E. Watkins, 1st Floor 85034 Phoenix United States | XO Communications | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix (East University Drive) 3410 E University Dr 85034 Phoenix USA | Cogent Communications Inc. | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix (North 36th Avenue) 2820 N 36th Ave 85009-1318 Phoenix USA | Copper State Communications | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix (North 3rd Street) 3220 N 3rd St 85012 Phoenix United States | CenturyLink | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix (South 16th Street) 811 South Sixteenth Street 85034 Phoenix United States | CenturyLink | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix Campus (Menlo Digital) | Menlo Digital | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix Data Center Campus: AZ1 | Vantage Data Centers | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix Investments Michigan City Data Center | Phoenix Investments | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Phoenix NAP 3402 East University Drive 85034 Phoenix United States | Phoenix NAP | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PhoenixNAP PHX01 | PhoenixNAP | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PhoenixNAP PHX02 | PhoenixNAP | AZ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pine Ridge Data Center 10605 W 84th Terrace KS 66214 Lenexa United States | DataBank | KS (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pine Ridge Data Center 10605 W. 84th Terr. KS 66214 Lenexa United States | Arsalon Technologies | KS (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pine Ridge Data Center MCI2 | DataBank | KS (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pine Ridge Technology Center | Eagle Rock Partners LLC | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pioneer IA5 Site | DIGTB | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pioneer Park (Phase 1 and 2) | DataNovaX | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Piscataway 101 Possumtown Rd 08854-3706 Piscataway Township USA | Quality Technology Services (QTS) | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Piscataway 101 Possumtown Rd 08854-3706 Piscataway Township USA | Green House Data | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Piscataway 3 Corporate Pl, ste 300 08854-4119 Piscataway Township USA | Brookfield Infrastructure Partners LP | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Piscataway Data Center: EWR2 | DataBank | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pitt Race Data Center | — | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pittock Internet Exchange 921 SW Washington St. 97205 Portland United States | Pittock Internet Exchange | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pittsburg 650 Smithfield 15222 Pittsburgh United States | Cogent Communications Inc. | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pittsburgh 282 Corliss Street PA 15220 Pittsburgh United States | EdgeConneX | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pittsburgh 3 Allegheny Square E, 1st floor 15212 Pittsburgh USA | XO Communications | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pittsburgh 2202 Liberty Ave 15222 Pittsburgh USA | vXchnge | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pittsburgh ACM 1 Allegheny Center Mall 15212 Pittsburgh United States | Expedient | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pittsburgh Data Center 100 S Commons 15212 Pittsburgh USA | DataBank | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pittsburgh Green Tree 810 Parish Street 15220 Pittsburgh United States | Expedient | PA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pivot Campus | Amazon | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Pixel Factory | PIXEL FACTORY DEVELOPMENT LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Plano 3500 E Plano Pkwy 75074 Plano USA | Flexential | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Plano Data Center: DFW3 | DataBank | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Plano Data Center: DFW8 | DataBank | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Plaza 500 | Starwood Capital Group | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PlusOne Atlanta Data Center 470 East Paces Ferry Rd NE 30305-3301 Atlanta USA | PlusOne Atlanta | NE (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PNJ-01 / -02 | Chirisa Technology Parks | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Polaris Forge 1 Campus - Phase 1 | Applied Digital | ND (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Polaris Forge 1 Campus - Phase 2 | Applied Digital | ND (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Polaris Forge 1 Campus - Phase 3 | Applied Digital | ND (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Polaris Forge 2 | Applied Digital | ND (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PORPOISE VENTURES LLC (Digital Realty Trust) | PORPOISE VENTURES LLC (Digital Realty Trust) | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland 1233 NW 12th Ave., #201 OR 97209 Portland United States | vXchnge | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland 23245 NW Evergreen Parkway, Building C, Suite C-300 OR 97124 Portland United States | EdgeConneX | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland 1225 W Burnside St 97209 Portland USA | TATA Communications | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland 21515 NW Evergreen Pkwy 97124 Hillsboro USA | Infomart | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland 9705 SW Sunshine Ct 97005-4190 Beaverton USA | Green House Data | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland (Cumberland Avenue) 340 Cumberland Ave 04101-3090 Portland USA | FirstLight | ME (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland (Southwest 6th Avenue) 520 SW 6th Ave 97204 Portland United States | CenturyLink | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland 1 10575 SW Cascade Ave, Suite 150 97223 Tigard United States | XO Communications | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland 2 9000 SW Nimbus Ave 97008 Beaverton United States | XO Communications | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland Data Center Portland ME Portland United States | ColoSpace | ME (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portland Data Center 625 SW Stark Street 97205 Portland United States | LightPoint Colocation & Hosting | OR (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PORTS Technology Campus - Phase 1 | SB Energy | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PORTS Technology Campus - Phase 2 | SB Energy | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portsmouth (Corporate Drive) 359 Corporate Dr 03801 Portsmouth USA | FirstLight | NH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Portsmouth Data Center Portsmouth NH Portsmouth United States | ColoSpace | NH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Potomac Technology Park | Plaza Realty Management Inc | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerCampus Austin | Skybox | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerCampus Dallas | Skybox | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse 1600 Digital Drive | PowerHouse | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse 95 - Phase 1 | PowerHouse | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse 95 - Phase 2 | PowerHouse | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse ABX-1 | PowerHouse | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse Arcola | PowerHouse | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse Charlotte | PowerHouse | NC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse CTP-02 | PowerHouse | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse CTP-03 | PowerHouse | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse Grand Prairie - Phase 1 | PowerHouse | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse Grand Prairie - Phase 2 | PowerHouse | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | PowerHouse Hobart | PowerHouse | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.