Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 102 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Data center | Microsoft New Albany Data Center | Microsoft | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Pecos Data Center | Microsoft | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Project Alluvion | Microsoft | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Project Ginger East | Microsoft | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Project Ginger West | Microsoft | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Project Mountain | Microsoft | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Project Osmium | Microsoft | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Project Ruthenium | Microsoft | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Rome Data Center | Microsoft | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Microsoft Van Meter | Microsoft | IA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Mid Michigan (Exchange Drive) 5225 Exchange Drive 48507 Flint Township United States | Online Tech | MI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Mid-Atlantic Advanced Manufacturing Center | Arup Americas Inc | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Mid-County Industrial Park | MINNIEVILLE CAPITAL ACQUISITION | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MIDCON Recovery Solutions 13431 N. Broadway Extension 73114 Oklahoma City United States | MIDCON Inc. | OK (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Middletown Data Center | Middletown Data Center LLC | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Midlothian Campus | TX (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Midtown Atlanta Data Center: ATL1 | DataBank | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Milwaukee 325 E Wisconsin Ave 53202 Milwaukee USA | Windstream Services, LLC | WI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Milwaukee 3701 W Burnham St, Ste. A 53215 West Milwaukee USA | TierPoint | WI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Milwaukee (East Wisconsin) 324 E Wisconsin Ave 53202 Milwaukee USA | Cogent Communications Inc. | WI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MIN1 | Cologix | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MIN2 | Cologix | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MIN3 | Cologix | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MIN4 | Cologix | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MIN5 | Cologix | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MindSHIFT Commack 47 Mall Drive 11725 Commack United States | MindSHIFT | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis 10290 West 70th Street MN 55344 Eden Prairie United States | OneNeck | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis 1708 W Creek Ln 55318 Chaska USA | Stream Data Centers | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis 6875 Shady Oak Rd 55344-3420 Eden Prairie USA | EdgeConneX | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis 511 11th Ave S 55415 Minneapolis USA | vXchnge | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis (11th Avenue South) 511 11th Ave S 55415 Minneapolis United States | CenturyLink | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis (Marquette Ave.) 250 Marquette Avenue, 1st floor 55401 Minneapolis United States | XO Communications | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis (South Marquette Avenue) 250 S Marquette Ave 55401 Minneapolis USA | Cogent Communications Inc. | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis (Washington Ave.) 1200 N Washington Ave, 1st floor 55401 Minneapolis USA | XO Communications | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis 1 511 11th Ave S 55415 Minneapolis USA | Cologix | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis 2 511 11th Ave S 55415 Minneapolis USA | Cologix | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minneapolis 3 511 11th Ave S 55415 Minneapolis USA | Cologix | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minnetonka 5500 Feltl Rd 55343-7920 Hopkins USA | CenturyLink | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Minnetonka Data Center 5480 Feltl Rd 55343-7982 Hopkins USA | Carter Validus Mission Critical REIT | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MMM Acquisitions Data Center | MMM Acquisitions | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Mobile (South Royal Street) 63 S Royal St #300 36602 Mobile United States | CenturyLink | AL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MOC-1 | — | SC (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Modesto City Tower 801 Tenth Street 95354 Modesto United States | Ayera Technologies | CA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Monarch Compute Campus - Phase 1 | American Intelligence & Power | WV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Monarch Compute Campus - Phase 2 | American Intelligence & Power | WV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Monroe East Monroe Street 316 46601 South Bend United States | CyrusOne | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Monroe 1109 Hudson Lane 71201 Monroe United States | Bayou Internet and Communications | LA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Montgomery County Solar Way 37040 Clarksville USA | TN (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | Montgomery Data Center | Meta | AL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Moses Lake, Washington 4949 Randolph Rd NE WA 98837 Moses Lake United States | ServerFarm | NE (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Mount Prospect Data Cente: ORD3 | DataBank | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Mountain Road Technology Park | Tract | VA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MSB Matrix Data Center Phase 1 | MSB Global Services | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MSB Matrix Data Center Phase 2 | MSB Global Services | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MSP Campus | CloudHQ | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MSP1 Data Center | Centra | MN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | MTC 2810 Sweet Home 14228 Amherst United States | Matrix Telecommunications Corporation | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | N15W24250 Riverwood Drive N15W24250 Riverwood Dr 53188 Waukesha USA | Mapletree Redwood Data Centre Trust (MRDCT) | WI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 101 Molloy Street 37201 Nashville United States | XO Communications | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 1841 Air Lane Drive, Bldg 3 TN 37210 Nashville United States | EdgeConneX | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 147 Fourth Ave, 8th floor 37219 Nashville United States | 365 Data Centers | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 940 3rd Ave North 37201 Nashville United States | Windstream Services, LLC | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 2992 Sidco Drive 37201 Nashville United States | CenturyLink | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 311 Eddy Ln 37064 Franklin USA | TierPoint | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 211 Commerce St 37201 Nashville USA | vXchnge | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 1661 Murfreesboro Pike 37217-2917 Nashville USA | Nexus Group | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 1 7100 Commerce Way, Suite 25 37027 Brentwood United States | Flexential | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 2 425 Duke Dr 37067 Franklin USA | Flexential | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville 3 4600 Carothers Pkwy 37067 Franklin USA | Flexential | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nashville I | Radius Data Centers | TN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | NASPlex Data Center 6867 Bluebonnet Blvd. 70810 Baton Rouge United States | NASPlex | LA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | NationalNet 1130 Powers Ferry Pl SE 30067 Marietta United States | NationalNet, Inc. | GA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nationwide Internet 2323 Bryan Street 75201 Dallas United States | Nationwide | TX (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | NaviSite New York 395 Hudson St | NaviSite, Inc. | NY (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | NE Edge Millstone Data Center | NE Edge | CT (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nebius Birmingham Data Center | Nebius | AL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Nebius NJ Data Center | Nebius | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Net Access - Cedar Knolls I 9 Wing Drive 07927 Cedar Knolls United States | Net Access Corporation | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Net Access - Parsippany I 1719 Route 10 07054 Parsippany United States | Net Access Corporation | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Net Access - Parsippany II 200 Webro Road 07054 Parsippany United States | Net Access Corporation | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | NETL Computational Science & Engineering Center | National Energy Technology Laboratory | WV (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Netriver 4200 194th St.SW 98036 Lynnwood United States | NetRiver | WA (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | NetSource Data Center 2368 Corporate Lane 60563 Naperville United States | NetSource | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Network 222 222 West Washington Avenue 53703 Madison United States | Fiore Companies | WI (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | Neutral Tandem 717 S Wells St. 60607 Chicago United States | Inteliquent | IL (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany New Albany Road East OH New Albany United States | Compass Datacenters | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany 1367 Beech Rd SW 43062-9762 Pataskala USA | OH (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | New Albany 1 | QTS | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany 2 | QTS | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany Business Park New Albany Business Park OH New Albany United States | CBRE | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany Data Center - Phase 1 | OH (city-level) | existing or reported | — | — | — | ATLAS data center map | |
| Data center | New Albany Data Center - Phase 2 | Meta | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany Data Center - Phase 3 | Meta | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany Data Center - Phase 4 | Meta | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany Data Center - Phase 5 | Meta | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Albany Data Center Campus: OH1 | Vantage Data Centers | OH (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Carlisle Data Center | — | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Era Lea Data Center | New Era Energy | NM (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Haven Data Center | — | IN (city-level) | existing or reported | — | — | — | ATLAS data center map |
| Data center | New Jersey 3003 Woodbridge Ave. 08837 Edison United States | Iron Mountain | NJ (city-level) | existing or reported | — | — | — | ATLAS data center map |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.
Want to know what is near one specific site, which utility tariff applies and what could stop it? Run a free site check. Also available as a free JSON API.