Known data centers and power projects, with the source on every row.
A free, filterable list built from open data: 3,242 known data centers and 8,163 power plants of 10 MW or more (operating, planned and retired), plus planned Texas projects with a signed interconnection agreement. It is a starting list, not a complete one.
11,405 results, page 10 of 115. Biggest first.
| Type | Name | Owner | Where | Status | MW | Fuel | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Power plant | Black Dog utility owner | Northern States Power Co - Minnesota | MN | operating | 563 | Gas | 1954 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | High Lonesome Wind Power, LLC Hybrid independent owner | High Lonesome Wind Power, LLC | TX | operating | 563 | Wind | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Vermont Yankee independent owner | Entergy Nuclear Vermont Yankee | VT | retired | 563 | Nuclear | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | RockGen Energy Center utility owner | Dairyland Power Coop | WI | operating | 561 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kewaunee independent owner | Dominion Energy Kewaunee Inc. | WI | retired | 560 | Nuclear | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McManus utility owner | Georgia Power Co | GA | operating | 560 | Oil | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bear Garden utility owner | Virginia Electric & Power Co | VA | operating | 559 | Gas | 2011 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Palomar Energy utility owner | San Diego Gas & Electric Co | CA | operating | 559 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Flint Creek utility owner | Southwestern Electric Power Co | AR | operating | 558 | Coal | 1978 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Holly Street utility owner | Austin Energy | TX | retired | 558 | Gas | 2007 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | R D Morrow utility owner | Cooperative Energy | MS | operating | 558 | Gas | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cosumnes Power Plant utility owner | Sacramento Municipal Util Dist | CA | operating | 557 | Gas | 2006 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hecate Energy Cider Solar LLC under construction | Greenbacker Renewable Energy Corporation | NY | planned | 557 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Allegheny Energy Units 3 4 & 5 independent owner | Springdale Energy LLC | PA | operating | 556 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | West Lorain independent owner | Vermillion Power LLC | OH | operating | 556 | Gas | 1973 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Carville Energy LLC independent owner | Carville Energy LLC | LA | operating | 555 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Front Range Power Plant utility owner | City of Colorado Springs - (CO) | CO | operating | 554 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lake Catherine utility owner | Entergy Arkansas LLC | AR | operating | 553 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Pawnee utility owner | Public Service Co of Colorado | CO | operating | 552 | Gas | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Attala utility owner | Entergy Mississippi LLC | MS | operating | 551 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hidalgo Energy Center independent owner | Calpine Corp - Hidalgo | TX | operating | 551 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McClain Energy Facility utility owner | Oklahoma Gas & Electric Co | OK | operating | 551 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hashknife Energy Center LLC under construction, over half done | Invenergy Services LLC | AZ | planned | 550 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maine Independence Station independent owner | Casco Bay Energy Co LLC | ME | operating | 550 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maricopa Solar independent owner | Maricopa Solar | AZ | operating | 550 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Maricopa Solar under construction | Maricopa Solar | AZ | planned | 550 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Oyster Creek independent owner | Constellation Nuclear | NJ | retired | 550 | Nuclear | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Quail Run Energy Center independent owner | Quail Run Energy Partners, LP | TX | operating | 550 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Harbor utility owner | Los Angeles Department of Water & Power | CA | operating | 548 | Gas | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Smith Mountain utility owner | Appalachian Power Co | VA | operating | 548 | Hydro | 1965 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Croydon CT Generating Station independent owner | Constellation Power, Inc | PA | operating | 546 | Oil | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Louisa Generation Facility utility owner | Old Dominion Electric Coop | VA | operating | 546 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Kings Mountain Energy Center independent owner | Carolina Power Partners, LLC | NC | operating | 544 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Middletown Energy Center independent owner | Ohio Power Partners, LLC | OH | operating | 544 | Gas | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lewis Creek utility owner | Entergy Texas Inc. | TX | operating | 543 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Stony Brook utility owner | Massachusetts Mun Wholes Electric Co | MA | operating | 542 | Oil | 1981 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Shady Hills Generating Station independent owner | Shady Hills Power Co LLC | FL | operating | 541 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Anadarko Plant utility owner | Western Farmers Elec Coop, Inc | OK | operating | 540 | Gas | 1977 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Chattahoochee Energy Facility utility owner | Oglethorpe Power Corporation | GA | operating | 540 | Gas | 2003 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Michigan City utility owner | Northern Indiana Pub Serv Co | IN | operating | 540 | Coal | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | MRP Elgin LLC independent owner | Lincoln Operating Services, LLC | IL | operating | 540 | Gas | 2002 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Northeast (MO) utility owner | Evergy Metro | MO | operating | 540 | Oil | 1972 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rexford Solar Farm independent owner | AES Clean Energy | CA | operating | 540 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Big Bend Dam utility owner | USACE-Omaha | SD | operating | 538 | Hydro | 1964 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dean H Mitchell utility owner | Northern Indiana Pub Serv Co | IN | retired | 538 | Coal | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lakefield Junction utility owner | Great River Energy | MN | operating | 538 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Danskammer Generating Station independent owner | Danskammer Energy | NY | operating | 537 | Gas | 1951 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Desert Star Energy Center utility owner | Desert Star Energy Center SDG&E | NV | operating | 537 | Gas | 2000 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | El Segundo Energy Center LLC independent owner | NRG Energy Services LLC | CA | operating | 537 | Gas | 2013 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Cedar Bayou 4 independent owner | NRG Cedar Bayou Development Company LLC | TX | operating | 536 | Gas | 2009 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Morgan Creek independent owner | Luminant Generation Company LLC | TX | operating | 536 | Oil | 1988 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Conowingo independent owner | Constellation Power, Inc | MD | operating | 531 | Hydro | 1928 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | McGrau Ford Battery Storage Facility utility owner | Georgia Power Co | GA | operating | 530 | Battery storage | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Frontera Energy Center independent owner | Frontera Generation Limited Partnership | TX | operating | 529 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | H Wilson Sundt Generating Station utility owner | Tucson Electric Power Co | AZ | operating | 529 | Gas | 1962 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Turtle Creek utility owner | Omaha Public Power District | NE | operating | 528 | Gas | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Zeltmann utility owner | New York Power Authority | NY | operating | 528 | Gas | 2005 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Montana Power Station utility owner | El Paso Electric Co | TX | operating | 527 | Gas | 2015 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Aviator Wind independent owner | Aviator Wind, LLC | TX | operating | 525 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Birdsboro Power independent owner | Birdsboro Power LLC | PA | operating | 525 | Gas | 2019 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Faraday Solar independent owner | Faraday Solar B LLC | UT | operating | 525 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Libby utility owner | USACE Northwestern Division | MT | operating | 525 | Hydro | 1975 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rocky Mountain Solar utility owner | Public Service Co of Colorado | CO | operating | 525 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Dundee East A Wind interconnection agreement signed 2025-02; online expected 2027-12; request 27INR0005; financial security poste | — | Baylor Co., TX | planned | 524 | Wind | 2027 | ERCOT planned capacity changes |
| Power plant | Sibley utility owner | Evergy Missouri West | MO | retired | 524 | Coal | 2018 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Avalon BESS interconnection agreement signed 2024-12; online expected 2026-12; request 26INR0375 | — | Fort Bend Co., TX | planned | 522 | Battery storage | 2026 | ERCOT planned capacity changes |
| Power plant | Long Ridge Energy Generation independent owner | Long Ridge Energy Generation LLC | OH | operating | 522 | Gas | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Sagamore Wind utility owner | Southwestern Public Service Co | NM | operating | 522 | Wind | 2020 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Mustang Station utility owner | Golden Spread Electric Cooperative, Inc | TX | operating | 521 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | B C Cobb utility owner | Consumers Energy Co - (MI) | MI | retired | 520 | Coal | 2016 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bridgeport Energy Project independent owner | Bridgeport Energy LLC | CT | operating | 520 | Gas | 1998 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Royal Slope approvals received | Royal Slope Solar LLC | WA | planned | 520 | Battery storage | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ceredo Generating Station utility owner | Appalachian Power Co | WV | operating | 519 | Gas | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ingleside Cogeneration independent owner | Ingleside Cogeneration LP | TX | operating | 517 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Lawrence Energy Center utility owner | Evergy Kansas Central, Inc | KS | operating | 517 | Coal | 1960 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Country Acres Clean Power LLC under construction | Clenera DevCo LLC | CA | planned | 516 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Renegade Project interconnection agreement signed 2021-01; online expected 2028-01; request 20INR0255; financial security poste | — | Deaf Smith Co., TX | planned | 516 | Solar | 2028 | ERCOT planned capacity changes |
| Power plant | Hecate Energy Outpost Solar LLC independent owner | Repsol Renewables NA | TX | operating | 515 | Solar | 2025 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Manchester Street independent owner | Manchester Street, LLC. | RI | operating | 515 | Gas | 1995 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Renegade Solar Project (Dawn) approvals received | Renegade Renewables, LLC | TX | planned | 515 | Solar | 2027 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Hecate Energy Harley Hand Solar LLC planned, approvals not started | Hecate Energy Harley Hand Solar LLC | TX | planned | 514 | Solar | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Potomac River independent owner | NRG Potomac River LLC | VA | retired | 514 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Red Hills Generating Facility independent owner | Choctaw Generation L.P, L.L.L.P. | MS | operating | 514 | Coal | 2001 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Bonanza utility owner | Deseret Generation & Tran Coop | UT | operating | 512 | Coal | 1986 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Gilbert independent owner | Gilbert Power, LLC | NJ | operating | 512 | Gas | 1974 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Centennial Flats independent owner | Copia Power | AZ | operating | 511 | Solar | 2026 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Moselle utility owner | Cooperative Energy | MS | operating | 511 | Gas | 1970 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Ross Storage interconnection agreement signed 2024-06; online expected 2027-07; request 26INR0156 | — | Refugio Co., TX | planned | 511 | Battery storage | 2027 | ERCOT planned capacity changes |
| Power plant | Elrama Power Plant independent owner | GenOn Power Midwest, LP | PA | retired | 510 | Coal | 2014 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | D B Wilson utility owner | Big Rivers Electric Corp | KY | operating | 509 | Coal | 1984 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | HF Lee Plant utility owner | Duke Energy Progress - (NC) | NC | retired | 508 | Coal | 2012 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Joliet 9 independent owner | Midwest Generations EME LLC | IL | retired | 508 | Gas | 2023 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tres Rios Ranch Solar interconnection agreement signed 2025-12; online expected 2027-12; request 24INR0404 | — | Upton Co., TX | planned | 508 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | St Francis Energy Facility utility owner | Associated Electric Coop, Inc | MO | operating | 507 | Gas | 1999 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Tehuacana Creek Solar interconnection agreement signed 2024-11; online expected 2027-05; request 24INR0188; financial security poste | — | Navarro Co., TX | planned | 505 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | New Caledonia planned, approvals not started | Tennessee Valley Authority | MS | planned | 504 | Gas | 2028 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Rail Tie Wind approvals pending | Repsol Renewables NA | WY | planned | 504 | Wind | 2029 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | TB Flats utility owner | PacifiCorp | WY | operating | 503 | Wind | 2021 | U.S. Energy Information Administration, Form EIA-860M |
| Power plant | Austin Bayou Solar interconnection agreement signed 2023-11; online expected 2027-06; request 25INR0102; financial security poste | — | Brazoria Co., TX | planned | 503 | Solar | 2027 | ERCOT planned capacity changes |
| Power plant | Duffy Solar interconnection agreement signed 2023-04; online expected 2027-12; request 23INR0057; financial security poste | — | Matagorda Co., TX | planned | 503 | Solar | 2027 | ERCOT planned capacity changes |
Data center locations are city-level, so they can be off by several miles, and MW is not published for them in this data. A project not listed here may still exist. Texas planned projects are listed by county only. ERCOT lists these projects by county only, with no map location or owner. A listed project can be delayed or cancelled, and one that is not listed may still be in the interconnection queue.
Sources: U.S. Energy Information Administration, Form EIA-860M (public domain) · Texas planned projects: ERCOT planned capacity changes (public monthly workbook) · Data centers (c) Ringmast4r - Global-Data-Center-Map (github.com/Ringmast4r/Global-Data-Center-Map). Facility locations vary in precision and are not verified ground truth — treat each entry as a lead on an existing nearby facility, not a confirmed fact.